Facade contractor, Toronto

Glass, stone and metal, closed in one floor at a time.

Stone fins, curtain wall and architectural metal for high-rise towers. Our crews follow the structure up, so the building is weathertight sooner.

Made for this skyline and its winters.

Air, water and thermal performance proven on a full-size mock-up before a single production panel ships.

Send us your tower.

Drawings, height and schedule. We come back with a price, or a design-assist plan if you are still in design.

What we build

Six scopes, one accountable trade. Most towers use three or four of them together.

Price a scope
  • Stone/Metal fins and Cladding Systems

    Large-format stone/Metal-look panels and verius Cladding Systems. Our signature work.

    BracketsPanelsReveals

  • Unitized curtain wall

    Factory-glazed units, hoisted and stacked floor by floor. Better quality control and a faster close-in.

    TowersFactory glazed

  • Stick-built curtain wall and window wall

    For podiums, amenity floors and geometry that will not repeat.

    PodiumsAmenity

  • Architectural metal

    Crowns, spandrels, soffits and trim in anodized and PVDF-coated aluminium, including brass-tone finishes.

    CrownsSoffitsTrim

  • Heritage and podium tie-ins

    New glazing married to retained masonry bases without losing either one.

    Retained facades

  • Facade engineering and shop drawings

    In-house engineering, mock-ups and coordination with structure and MEP, from design assist to sign-off.

    Design assistMock-ups

How we install

Mandatory 5-Point PPE standard

  1. Head Protection

    CSA Z94.1 Type II Class E Safety Helmet with integrated 4-point chin strap

  2. Foot Protection

    CSA Grade 1 Approved Boots (Green Triangle / Omega patch), minimum 6-inch ankle support.

  3. Eye Protection

    CSA Z94.3 / ANSI Z87.1 Approved Safety Glasses with permanently attached side shields.

  4. High-Visibility Apparel and Hand Protection

    CSA Z96 Class 2, Level 2Jacket & Mandatory Cut-Resistant Gloves

A red compact tracked crane on the concrete floor slab lowers a tall stone fin panel past the slab edge, while the operator works the controls behind a red and white danger tape line.

Made for the people who build towers.

Manufacturers

One contract from engineering to sealant, and a facade that still looks like the rendering ten years on.

General contractors

A trade that shows up when the schedule says, keeps its own edge zone safe, and closes the envelope floor by floor behind your structure.

Architects and facade consultants

Design assist early, honest mock-ups, and fins, crowns and joints held to the drawing.

Bid invitations and enquiries

Send us your tower.

Tell us the address, the height and where you are in design. We price full envelope packages and single scopes, and we join early for design assist.